![]() Interesting Facts About the Dredging Process To make arrangements for private dredging, contact Dave Taliano at 51. All personal requests should be accompanied by strong support of the Puslinch Lake Conservation Association. ![]() The PLCA's overall dredge plan takes precedence over private dredging. Financial commitments will determine who gets dredged first and in what order. The average cost, depending on how many loads are being removed, will be $2750.00. Dredging started on July 21st and hopefully will continue through to mid November. During days of high wind in this area we will be digging in an area east of the big island, using the island as a wind break to prevent the barge & equipment from being blown into the eastern shores. The Private dredging location this year is on the South & South/Eastern side of the lake and will be followed by the eastern side of the lake in the area that borders the O'Krafka's residence ( Eagle Point ) and the Chute's residence ( North/East shore). The dewatering pit is filling up quickly, anticipate it to be completely full at year end. ![]() Close to 300,000 tons has been removed to date (2023). Total time per load is approximately 3 - 3 1/2 hours per load. An average round trip takes 1 1/2 -1 3/4 hours to travel, 30 minutes to load, and 1 hour to off-load. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |